A structured implementation approach is required for rapid SAP transformation.
SAP implementation projects, when planned with the right approach, can quickly add value to organizations.
For this process to proceed effectively:
-
Clearly defining the scope from the outset.
-
Standardizing processes as much as possible
-
It is important that the project plan is realistic and manageable.
Redigo RapidS4™ enables fast and controlled SAP implementation with fit-to-standard approach
With its standardized approach, RapidS4™ enables:
-
Clarifies the project scope from the start
-
Simplifies processes with the fit-to-standard principle
-
Advances the implementation in a planned and controlled manner
Consequently, your SAP system is deployed in a shorter period, and your operations become active quickly.
How Does It Work

Define
The project scope and process structure are clarified.
-
Fit-to-standard approach
-
Identifying the basic processes
-
Limiting the scope of the project.
1
Configure
The SAP system is configured according to the defined scope.
-
Installation of basic modules (FI, CO, MM, SD)
-
Necessary development and integrations
-
System configuration
2
Validate
The system is tested to ensure its accuracy and functionality.
-
Testing and UAT processes
-
Data verification
-
System control
3
Go-Live
The SAP system is deployed live and operational use begins.
-
Go-live plan
-
Cutover processes
-
System commissioning
4
What Do We Offer?
-
Predefined scope and project approach with a rapid implementation model.
-
Fit-to-standard process design and standard SAP configuration.
-
Installation of basic SAP modules (FI, CO, MM, SD)
-
Performing the necessary development and integrations.
-
Execution of testing, UAT (Universal Activity Reporting), and data validation processes.
-
Go-live plan and go-live management
-
Live SAP system in operation
-
Standard process documentation and project outputs.
-
Go-live checklist and handover
It Is Suitable For:
-
Companies looking to invest in SAP
-
Organizations aiming for rapid and controlled implementation
-
Organizations that want rapid deployment with standard processes.
Project Duration Model
9-12 months throughout the project (depending on scope)
The study is structured according to the size and scope of the institution.